Download Print this page
De Agostini Model Space MiG-29 Manual

De Agostini Model Space MiG-29 Manual

Pack 3
Hide thumbs Also See for Model Space MiG-29:

Advertisement

Quick Links

PACK 3

Advertisement

loading
Need help?

Need help?

Do you have a question about the Model Space MiG-29 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for De Agostini Model Space MiG-29

  • Page 1 PACK 3...
  • Page 2 Published in the UK by De Agostini UK Ltd, Royds Withy King, 65 Carter Lane, London EC4V 5EQ. Published in the USA by De Agostini Publishing USA, Inc., 299 Park Avenue • New York, New York 10171. All rights reserved © 2019 Warning: Not suitable for children under the age of 14.
  • Page 3 Stage 11: Countermeasure launchers Assembly D017 D018 Retrieve the fuselage assembly from Stage 10. Fit the port countermeasure launcher (D017) into the corresponding holes in the port side of the fuselage. Secure the launcher from the underside of the fuselage with two VM screws. Your parts 1.
  • Page 4 D018 Secure the launcher from the underside of the fuselage with two BM screws. Fit the starboard countermeasure launcher (D018) into the corresponding holes in the starboard side of the fuselage. Secure the launcher from the underside of the fuselage with two BM screws. This stage of assembly is now complete.
  • Page 5 Stage 12: Wing attachment fittings Your parts 1. D030 - Wing attachment D030 fitting bottom plate (6 pieces). 2. D024 - Wing attachment fitting upper plate (6 pieces). GM screws 2 x 3mm D024 (15 pieces) D030 D030 D030 D016 Assembly Retrieve the upper fuselage assembly.
  • Page 6 D024 D024 D024 D024 D024 D024 Fix the wing attachment fitting upper plates (D024) onto the tabs at the side of the fuselage. Secure them into place with GM screws. This stage is now complete. Keep any unused or leftover parts to one side.
  • Page 7 Stage 13: Frame assembly Your parts P043 1. P042 - frame No. 4 2. P043 - frame No. 5A. CM screws 1.7 x 3.5mm (5 pieces) The numbering of the frames matches those of the real MiG-29. P042 Assembly Retrieve the fuselage assembly. Fit frame No.
  • Page 8 P043 P043 Place frame No. 5A (P043) onto the fuselage frame behind frame No. 4. Secure the parts with two CM screws. This stage is now complete. Keep any unused or leftover parts to one side.
  • Page 9 Stage 14: Frame assembly Your parts P044 1. P044 - frame No. 6B 2. P045 - frame No. 7 DM screws 1.7 x 4mm (3 pieces) CM screws 1.7 x 3.5mm (3 pieces) P045 Assembly Retrieve the fuselage section Fit frame No. 6B (P044) to the fuselage frame behind frame No. 5A, aligning the holes of both parts.
  • Page 10 P045 D016 Secure frame No. 7 (P045) at the end of the fuselage frame with two DM screws, as shown. This stage is now complete. Keep any unused or leftover parts to one side.
  • Page 11 Stage 15: Port mainwheel hydraulics D031 P046 D033 D032 P047 Your parts 1. D031 - Port landing gear wall 2. P046 - Port mainwheel hydraulics mount 3. D032 - Port mainwheel hydraulics shaft 4. D033 - Port mainwheel hydraulics pivot 5.
  • Page 12 Assembly P046 Insert the pins of the port mainwheel hydraulics mount (P046) into the holes in the port mainwheel hydraulics cylinder (P047). Press both parts together. P047 D033 Insert the port mainwheel hydraulics pivot (D033) into the end of the cylinder, as shown, and secure with an HM screw.