Rigging A Kara Iii DownLl Array Under A K3I Array With Karaiii-Downk3I - L-Acoustics K3i Owner's Manual

Table of Contents

Advertisement

Rigging a Kara IIi downll array under a K3i array with KARAIIi-DOWNK3i
Type of deployment
Rigging accessory
Screws and fasteners
Tools
Min number of operators
Rigging plates
x2
K3i-LINK
Risk of falling objects
Verify that no unattached items remain on the product or assembly.
Additional safety for own arrays
When ying an array, use available holes to implement a secondary safety.
Procedure
1. Prepare and raise an array of K3i. Refer to
2. Prepare a single Kara IIi with KARAIIi-ENDLINK. Refer to the Kara IIi owner's manual.
3. Assemble the three parts of KARAIIi-DOWNK3i with six M6x19 screws.
Do not fully tighten the screws.
K3i owner's manual (EN) version 1.0
Flying a K3i array with K3i-BUMP
T30
own array
KARAIIi-DOWNK3i
4 M8x35 rigging screws (provided)
10 M6x19 rigging screws (provided)
electric screwdriver with torque selector
T40 Torx bit
T30 Torx bit
3
(p.40).
Rigging procedures
49

Advertisement

Table of Contents
loading

Table of Contents