Sav 245.09 Operating Instructions Manual page 66

Precision sine tables with electro permanent magnets / electro magnets
Table of Contents

Advertisement

Available languages

Available languages

SAV 245.09 /.10 /.99
Before each use
Carry out a visual check of the precision sine tables with electro permanent magnetic chuck/electromagnetic
chuck.
Check the cleanliness of the pole plate, measuring bolt, gauge block supports and sine table bearing.
Carry out a visual check of the electrical connection with cable, junction box and any connectors.
At regular intervals
Finely dress the pole plate depending on wear. Observe the maximum machining thickness of the pole plate as
per section 3 "Technical specifications".
Check the pole plate as to whether the fastening threads for the pole plate have been exposed after continued
machining.
Check the underside of the magnet for contact corrosion.
Lubricate the sine table bearing with grease.
If a lifting mechanism is fitted, ensure to lubricate this.
7 MAINTENANCE AND REPAIRS
[
]
66
Version 1.0

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

245.10245.99

Table of Contents