Komatsu PC130-6K 2001 Operation & Maintenance Manual page 219

Hydraulic excavator
Table of Contents

Advertisement

9.
Screw in the oil filler cap and install the cover.
10. To bleed air,start the engine according to "12.2 STARTING ENGINE"
and run the engine at low idling for 10 minutes.
11. Stop the engine.
REMARK
Operate the machine after halting for more than 5 minutes to
eleminate bubbles in the oil inside the tank.
12. Check for oil leakage and wipe off any spilled oil.
When the hydraulic breaker is installed, the hydraulic oil deteriorates ear-
lier than in normal bucket digging work.
The first element replacement should be at 100 to 150 hours for new
machines. Thereafter replace the element according to the table on the
right.
Replace the additional filter element for the breaker every approx. 250
hours (when breaker operating ratio is more than 50%) according to the
table on the right. (See "24.2.11 REPLACE ADDITIONAL BREAKER FIL-
TER ELEMENT".)
24. SERVICE PROCEDURE
3-59

Advertisement

Table of Contents
loading

Table of Contents