Komatsu PC130-6K 2001 Operation & Maintenance Manual page 141

Hydraulic excavator
Table of Contents

Advertisement

9)
On commencement of lifting
Take up slack in the rope and check for work equipment movement,
(due to possibl hydraulic drift) adjust lifting hook position, if required,
to maintain rope length(s) and angles as shown in the figure on the
right.
10) Lift until the machine leaves the ground. At this point stop lifting and
check the balance of the machine.
11) If the machine is unstable lower and adjust rope and lifting hook posi-
tion.
12) Repeat steps 10) and 11) until machine stability is achieved then
slowly commence lifting operation.
13. TRANSPORTATION
2-89

Advertisement

Table of Contents
loading

Table of Contents