IndraDrive Mi Drive Systems with KCU02, KSM02,
KMS02/03, KMV03, KNK03, KLC03
Cables and connectors
Storage time / months
Measures for commissioning
> 1
> 12
> 60
■
■
■
Visual inspection of all parts to be damage-free
Check the electric contacts to verify that they are free from
■
■
corrosion
Visually inspect the cable jacket. Do not use the cable if you
■
detect any abnormalities (squeezed or kinked spots, color
deviations, ...).
Tab. 4-7:
Measure before commissioning cables and connectors that have
been stored over a prolonged period of time
General data and specifications
R911335703_Edition 04 Bosch Rexroth AG
49/407