Download Print this page

Advertisement

Quick Links

QUICK START GUIDE
How to Configure the RTU
Remote Connection, Software Upgrade & Port Configuration
RTU-300/320/600
June 2020 | Rev. A00
P/N: D08-00-036
VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505
www.veexinc.com

Advertisement

loading

Summary of Contents for VeEX RTU-300

  • Page 1 QUICK START GUIDE How to Configure the RTU Remote Connection, Software Upgrade & Port Configuration RTU-300/320/600 June 2020 | Rev. A00 P/N: D08-00-036 VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com...
  • Page 2 Make sure it is updated to the latest software packages available and that is has any related licenses that may be required. For assistance or questions related to this document and procedures, or to get a test set serviced by VeEX or an authorized service facility, please contact: VeEX Inc.
  • Page 3 The RTU-300/320/600 is a rack mounted 1G-100G Ethernet test head for performance testing and monitoring Carrier Ethernet and broadband networks. The main application of the RTU-300/320/600 is to be used under the VeSion™ performance testing and monitoring platform, where several RTU-300/320/600 can be added and operated for service provisioning, service activation testing, and service assurance applications.
  • Page 4: Connecting To The Unit

    Tool. Select the correct port to connect via serial connection on your PC. In this case, we are using COM3. Select the Probe Type as RTU-300. Click Open. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 5 Note: If you are using Putty for example, use the following settings to connect to the RTU (115200 baud rate). 3. The Status window will indicate that the serial port is opened. Once the port is open, click Connect. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com...
  • Page 6 VeSion TCP Port number order for the VeSion system to talk to the RTU. 6. Modify the IP address as required under Local IP/Local Subnet/Local Gateway. Click Apply. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 7 2. When the desired Operating Mode has been selected click Apply. The status window will indicate that the configuration has changed and the probe will be rebooted. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com...
  • Page 8 QUICK START GUIDE: RTU-300/320/600 Web Remote Access Menu/VNC (Standalone Mode) In order to operate the RTU-300/320/600, launch a new web browser window and type the RTU-300/320/600 management IP address. Login using appropriate credentials (Default User ID – admin and password - veexinc).
  • Page 9 Note: RTU-600 module supports only operation via web browser or VNC. 5. When the desired Operating Mode has been selected click Apply and then Reboot. The new configuration will take effect after the unit reboots. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 10 Upgrade tab: 1. Download and unzip the required software from https://www.veexinc.com/en-us/Support/Software. Make sure to enter the RTU-300/320/600 serial number to find the correct file. 2. The Platform SW (install_rtu300_platform.sh) has to be upgraded first followed by the module software upgrade (install_rtu300_rtu320.sh/install_rtu300_100g.sh). However, if only the module SW has to be upgraded, there is no need to upgrade the platform.
  • Page 11 6. Users will be asked to confirm if the upgrade procedure should continue, as a reboot will be performed at the end of the process. 7. When the reboot process has been completed, log back in to the RTU-300/320/600 and verify that the platform software version was updated on the home page.
  • Page 12 4. Once the upload process is completed and file verification is successful, click Upgrade. 5. When the reboot process has been completed, log back in to the RTU-300/320/600 and verify that the module software version was updated on the home page.
  • Page 13 Follow the TX320s and TX300-100G User Manual instructions to set up a Loopback, Throughput, RFC-2544 or V- SAM Test. You can find them in the downloads section of the product page at https://www.veexinc.com. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 14 2. Manager level credentials display System Configuration settings as shown below. 3. Under the System Configuration menu, the user can configure the RTU test ports and IP settings. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 15 4. Tester level credentials enable users to run tests. Privileges are limited to running tests and viewing configurations only. 5. Notice the difference between User access privileges and Manager level privileges as shown below. Manager level privileges User level privileges VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 16: Adding/Removing Users

    RTU test port and IP settings. 1. Log in with a user that has Manager privileges. Click System Configuration > Server & Device. All available sub- menus are shown below. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 17 QUICK START GUIDE: RTU-300/320/600 2. Make sure the RTU-300 is selected if other devices are also being used by this VeSion server. Select a module (Slot) as shown below and a Test Mode. The following test modes are available: •...
  • Page 18 While the changes are taking places, you will see In Progress status for Port Configure. When the configuration is done, the Succeeded status should appear instead. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 19 IP & Gateway. Running a Throughput Test via VeSion ◼ Run RFC-2544 Throughput Test Run Layer 3 ◼ Run V-SAM Test Throughput and V-PERF Test Core VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 20 Test. 2. Make sure the right RTU-300 is selected if other devices are also being used by this VeSion server. Select the test ports to be used on the left-hand side. Toggle in between the Port 1 & Port 2 configuration using the tabs as shown below.
  • Page 21 Use a relevant name to easily select a test that has to be run. Click Start to start a test. Test results are displayed dynamically. Click Stop if you need to stop the test. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 22 Stop if you need to stop the test. Test results are displayed dynamically. To view the different KPIs click on the different test results tabs. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 23 2. Set the mode to be Server, Client, Bidirectional Server, or Bidirectional Client. 3. Configure the TCP Port number and Start the test. Test Results are displayed dynamically. Click Stop if you need to stop the test. VeEX Inc. 2827 Lakeview Court, Fremont, CA 94538 USA Tel: +1.510.651.0500 Fax: +1.510.651.0505 www.veexinc.com CustomerCare@veexinc.com...
  • Page 24 VeEX Inc. provides innovative Test and Measurement solutions for next generation networks, services and communication equipment. With a blend of advanced technologies and vast technical expertise, VeEX has developed products that diligently address all stages of network deployment, maintenance, and field service turn-up and integrate service verification features across DSL, fiber optics, CATV/DOCSIS, mobile backhaul and fronthaul (CPRI/OBSAI), next-generation transport network, fiber channel, carrier and metro Ethernet technologies, WLAN, and synchronization.

This manual is also suitable for:

Rtu-320Rtu-600