HP ProCurve 4000M Installation Manual page 17

Dc switches
Table of Contents

Advertisement

Installing the Switch in a Seismic Rack
Introduction
The HP DC ProCurve switch can be fitted with a seismic rack mount kit
for installation in the HP Seismic Rack, or equivalent. This solution
fulfills NEBS requirements for telecommunication equipment installed
in a Central Office.
The steps for installing the HP DC ProCurve Switch are:
1. Attach switch to the tray.
2. Position the nut clips at the appropriate position on the rack
mounting rails.
3. Secure the switch and seismic tray to the rack.
The mounting process may vary, depending on the type of rack or cabinet
being used.
NOTE
See the HP ProCurve Switch 4000M and 8000M Installation Guide for
alternate rack and cabinet installation solutions. Only the kit containing
the Z7017-00001 rack mounting tray has been tested for NEBS
compliance.
Chapter 2
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procurve 8000m

Table of Contents