Download Print this page

Installation Overview - Pro Dunk Hoops Diamond Owner's Manual

Basketball system

Advertisement

Installation Overview

In order to have the safest, fun and longest use of your Pro Dunk® system,
please note and heed the following:
1) Prior to goal assembly, call utility services (811) for location of un-
derground utility lines before you dig.
2) Immediately unpack all components and cross check against bill
of materials. Report any shortages to Hoops Inc. customer ser-
vice at 1.888.600.8545.
3) Parts can be ordered at
4) Assembly is a two part process.
Day 1.
Complete Anchor System Installa-
tion Instructions. (Below)
Day 2.
Allow concrete to cure.
Day 3
Allow concrete to cure.
Day 4.
Allow concrete to cure.
5) For safety measures, have at least 4 capable persons to assist
you in assembly of your Pro Dunk® Goal.
White—Proposed Excavation
Pink—Temporary Survey Markings
Red—Electric Power Lines, Cables, Conduit, and Lighting Cables
Yellow—Gas, Oil, Petroleum, or Gaseous Materials
Orange—Communication, Alarm or Signal Lines, Cables or Conduit
Blue—Portable Water
Purple—Reclaimed Water, Irrigation and Slurry Lines
Green—Sewers and Drain Lines
Where Should I Install My Goal
produnkhoops.com/video/place_basketball_goal.html
www.produnkhoops.com/parts
PART 1
www.Call811.com
PART 2
Day 5.
Complete Pro Dunk® assem-
bly instructions.
6

Advertisement

loading