Download Print this page

Pro Dunk Hoops Diamond Owner's Manual page 14

Basketball system

Advertisement

PRO DUNK® ASSEMBLY INSTRUCTIONS
5) Main Pole Assembly
Loosen the top six 18mm J-Bolt Hex Nuts (L) from the
18mm Anchor J-Bolts (K). Level all six 18mm J-Bolt Hex
Nuts (L). Leave Anchor Footing Template (N) in place.
Install (6) metal washers (Z) on top of the anchor bolts
(K). Install the main pole (A) shown to the right. Install (6)
metal washers (Z) to top of the anchor bolts (K). Install
(6) lock washers (O) to top of the anchor bolts. Install (6)
18mm hex nuts (L) to top of the anchor bolts and tighten
down. Make sure that base plate is square to playing
surface.
Day ~5
Mounting The Main Pole
produnkhoops.com/video/mount_pole.html
14

Advertisement

loading