Use the level to ensure that the pier anchor template (L) it is level in all directions.
Additionally, the center line of the 18mm Anchor J-Bolts (K) must be parallel with the
edge of the playing surface.
Leveling the Pier
Once completely smooth let the concrete cure. This can take up to a week. Consult
the instructions on the concrete bag for curing times and directions.
Day 1 Complete!
Once level smooth
out with trowel
13