Download Print this page

Pro Dunk Hoops Diamond Owner's Manual page 2

Basketball system

Advertisement

Ref. Qty. Description
A
1
Vertical Post
B
1
Main Extension Arm
C
2
Parallel Linkages
D
1
H-Frame Backboard Mount (pre-assembled to backboard)
Spring-Assist Cartridges
E
2
F
1
Crank Adjustment Cylinder
G
1
Steel Rim Height Indicator
Rim Height Sticker
H
1
I
1
16mm X 14cm Hex Bolt
J
2
16mm Hex Nut
K
6
18mm Anchor J-Bolts (needed for day 1)
L
18
18mm J-Bolt Hex Nuts (12 of the 18 needed for day 1)
M
6
Anchor Footing Rebars (needed for day 1)
N
1
Anchor Footing Template (needed for day 1)
O
6
18mm Footing Lock Washers (needed for day 1)
P
1
16mm X 19mm Hex Bolt
Q
2
18mm X 36mm Hex Bolts
R
8
10mm X 3cm Hex Bolts (pre-assembled)
S
8
10mm Flatwashers (pre-assembled)
T
8
10mm Lockwashers (pre-assembled)
U
8
10mm Hex Nuts (pre-assembled)
V
2
18mm X 42cm Hex Bolts
W
4
Plastic and Steel Rim Spacers (for the rim assembly)
X
2
Main Pole Ears (1 left, 1 right)
Y
6
Main Pole Ear Bolts, washers and lock nuts
Z
12
18mm Anchor J-bolt Washers
AA
1
Black Safety Rod And Pin
BB
4
18mm Hex Nuts
CC
4
10mm X 7cm Hex Bolts (For the rim assembly)
DD
8
10mm Flatwashers (for the rim assembly)
EE
4
10mm Lockwashers (for the rim assembly)
Rim Plate Screws (for the rim assembly)
FF
2
GG
1
Metal Rim Plate (for the rim assembly)
HH
1
White Mesh Net (for the rim assembly)
II
1
Rim
(for the rim assembly)
JJ
2
20mm X 42cm Hex Bolts
KK
2
20mm Hex Nuts
LL
4
10mm Hext Nuts
Bill Of Materials
(for the rim assembly)
2

Advertisement

loading