Download Print this page

Pro Dunk Hoops Diamond Owner's Manual page 12

Basketball system

Advertisement

Pour the remaining concrete into the hole until completely full and coming out of the
top. Using a trowel, smooth the concrete to your preferred liking.
NOTE: The top of the concrete needs to be level with
or higher than your playing area to ensure you sys-
tem will adjust to 10ft regulation height.
Place the assembled anchor system in hole to the point where the bottom of the black
anchor plate (N) is flush with the top of the finished concrete and (3) 18mm J-Bolts (K)
are on the right and (3) 18mm J-Bolts (K) are on the left.
NOTE: The (6) 18mm J-Bolt Hex Nuts (L)
on the bottom of the Anchor Footing Tem-
plate (N) will be sacrificed into the concrete.
12

Advertisement

loading