Secabo TB7 Operating Manual page 5

Thermobase
Table of Contents

Advertisement

Installation and Commissioning of the Secabo TB7 on a
Secabo heat press
● Make sure that the Base Frame of the Secabo heat press is on a stable table.
● Remove the base plate of your Secabo heat press in the first step.
● Place the TB7 on the base of the Secabo heat press.
● Fix the TB7 to the base of the Secabo heat press from below using the two screws
provided.
● Alternatively, you can also mount the TB7 on the Secabo quick-change system or the
Secabo Slide extension.
● Place the table holder for the controller box on a flat surface near the TB7 and mount the
controller box in it.
● Attach the large 5-pin plug from the bottom of the TB7 to the matching socket on the
outside right of the controller box. (the other small 6-pin socket remains free)
● Plug in the supplied C13 power cord at the rear of the controller box and connect it to a
shock-proof socket, which must have a grounded connection, a fuse and an earth leakage
circuit breaker.
● The Secabo Thermobase TB7 is now ready for operation.
Secabo GmbH Hochstatt 6-8 85283 Wolnzach Germany mail@secabo.com www.secabo.com

Advertisement

Table of Contents
loading

Table of Contents