INSTALLATION
Specification
10.7 Tests in accordance with VDE 0701/0702
Earth conductor check
f Check the earth conductor (in Germany DGUV A3 for exam-
f
ple) across the earth conductor contact of the power cable
and the temperature controller fixing screw. Pull off the tem-
perature selector to do this.
11. Specification
11.1 Dimensions and connections
SNU HOT
263
140
c08
c01
100
c01
Cold water inlet
c08
Hot water outlet
20
| SNU HOT | HOT 3in1
230
70
SNU HOT
Male thread
G 3/8 A
Male thread
G 3/8 A
HOT 3in1
210
65
75
11.2 Wiring diagram
1/N/PE ~ 200-240 V
5
4
3
L N
1 Temperature limiter (safety fuses)
2 Temperature sensor
3 PCB
4 ON indicator (LED)
5 Electric heating
11.3 Heat-up time
During the initial commissioning and when drawing off the entire
hot water content, heat-up takes approx. 15 minutes.
ø 33
1
2
www.stiebel-eltron.com