Tests In Accordance With Vde 0701/0702; Specification; Dimensions And Connections; Wiring Diagram - STIEBEL ELTRON SNU HOT Installation Manual

Automatic water heater with open vented/sealed unvented kitchen tap
Hide thumbs Also See for SNU HOT:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

Specification

10.7 Tests in accordance with VDE 0701/0702

Earth conductor check
f Check the earth conductor (in Germany DGUV A3 for exam-
f
ple) across the earth conductor contact of the power cable
and the temperature controller fixing screw. Pull off the tem-
perature selector to do this.
11. Specification

11.1 Dimensions and connections

SNU HOT
263
140
c08
c01
100
c01
Cold water inlet
c08
Hot water outlet
20
| SNU HOT | HOT 3in1
230
70
SNU HOT
Male thread
G 3/8 A
Male thread
G 3/8 A
HOT 3in1
210
65
75

11.2 Wiring diagram

1/N/PE ~ 200-240 V
5
4
3
L N
1 Temperature limiter (safety fuses)
2 Temperature sensor
3 PCB
4 ON indicator (LED)
5 Electric heating

11.3 Heat-up time

During the initial commissioning and when drawing off the entire
hot water content, heat-up takes approx. 15 minutes.
ø 33
1
2
www.stiebel-eltron.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Snu hot gbHot 3in1

Table of Contents