7.2 Operating readiness

Check nozzle setting
• Check nozzle setting: Nozzle must have a distance of approx. 2-3 mm from the base material.
Installing the guide bar
1. Loosen the locking screw of the guide bar (18).
2. Fold up the guide bar 90° and retighten the locking screw of the guide bar (18). Make sure that the guide
bar is positioned perpendicular (90°) to the machine, otherwise the function of the wall switch (16) is not
guaranteed.
3. Push the guide bar at the top (21) into the guide bar at the bottom (19) and lock into place at the desired
height with the clamping lever on the guide bar (20).
Depending on where the automatic welder is used, it can be helpful to completely disassemble the guide bar.
For example, if there is an obstacle (radiator or similar) on the wall.