Ventilation

Fresh air ventilation is needed to maintain comfort levels. For a more prescriptive approach to adequate
ventilation, you could refer to the latest edition of the ANSI/ASHRAE (American Society of Heating, Refrigerating
and Air-Conditioning Engineers) document Ventilation for Acceptable Indoor Air Quality.
Adequate ventilation needs to be provided to ensure that potential airborne exposure to materials is adequately
controlled according to their Safety Data Sheets. Consult the Safety Data Sheets available at
http://www.hp.com/go/msds
Ventilation should meet local environmental, health, and safety (EHS) guidelines and regulations.
NOTE:
The ventilation units should not blow air directly onto the equipment.

Air conditioning

As with all equipment installations, to maintain ambient comfort levels, air conditioning in the work area should
take into account that the equipment produces heat. Typically, the processing station's power dissipation is 2.6
kW (8.8 kBTU/h).
Air conditioning should meet local environmental, health, and safety (EHS) guidelines and regulations.
NOTE:
The air conditioning units should not blow air directly onto the equipment.

Processing station electrical configuration

NOTE:
An electrician is required for the setup and configuration of the building electrical system used to power
the processing station, and also for the installation of the processing station. Make sure that your electrician is
appropriately certified according to local regulations and supplied with all the information regarding the
electrical configuration.
The processing station requires the following electrical components to be supplied and installed by the
customer, according to the Electrical Code requirements of the local jurisdiction of the country of installation.
Power Distribution Unit (PDU) including single-phase branch circuit breaker
30
Chapter 3 Site preparation requirements for the processing station
to identify chemical ingredients of your materials.