Integration, Setting And Leveling; Power Supply; Battery Operation (Option) - KERN CKE 6K0.02 User Manual

Counting scales
Hide thumbs Also See for CKE 6K0.02:
Table of Contents

Advertisement

7.3 Integration, setting and leveling

The correct location is decisive for the accurate weighing results of high-resolution scales
7.1).
(see chapter
 Remove four transport locks at the scales plate catches.
 Install the scales plate and, whenever required, also the wind breaker.
 Place the scales on smooth surface.
 Level the scales using the leveling feet. The air bubble in the leveler must be
present in the marked area.
 Check leveling at regular intervals.

7.4 Power supply

Choose the plug appropriate for the operation country and plug it into
the power supply.
Check if the scales voltage is set correctly. The scales can be connected
to the mains only when the voltage specified on the scales (sticker) and
the local voltage are identical.
Always use the original power supply by KERN. Using any other prod-
ucts requires KERN consent.
Important information:
Before you start the device, check the power cord for damage.
The power cord must not have any contact with liquids.
The plug must be always readily available.

7.5 Battery operation (option)

Once the batteries are discharged, the <instab> symbol is displayed.
 Turn the scales upside down carefully to get access to its bottom.
 Open the battery compartment and replace the batteries.
Always pay attention to the correct polarity.
 Replace the cover.
CKE-BA-e-2031
13

Advertisement

Table of Contents
loading

Table of Contents