Startup And Shutdown Procedures - Daikin Trailblazer AGZ030-101E Installation, Operation And Maintenance Manual

Air-cooled scroll compressor chillers with high efficiency variable speed fan technology
Table of Contents

Advertisement

NOTE: Installation and maintenance are to be performed
only by qualified personnel who are familiar with local
codes and regulations, and experienced with this type
of equipment.
DANGER
LOCKOUT/TAGOUT all power sources prior to starting,
pressurizing, de-pressuring, or powering down the Chiller.
Failure to follow this warning exactly can result in serious injury
or death. Be sure to read and understand the installation,
operation, and service instructions within this manual.
Pre-Startup
Inspect the chiller to ensure no components became loose or
damaged during shipping or installation including leak test and
wiring check. Complete the pre-start checklist at the front of
this manual and return to Daikin Applied prior to startup date.
Pre-Startup Checkout
1. Verify chilled water piping requirements from
are met.
2. Check the pump operation and vent all air from the
system.
3. Circulate evaporator water, checking for proper system
pressure and evaporator pressure drop. Compare the
pressure drop to the evaporator water pressure drop
curve.
4. Flush System and clean all water strainers before placing
the chiller into service.
5. Check water treatment and proper glycol percent, if
used.
6. Check all exposed brazed joints for evidence of leaks.
Joints may have been damaged during shipping or when
the unit was installed.
7. Check that all refrigerant valves are either opened or
closed as required for proper operation of the chiller.
8. A thorough leak test must be done using an electronic
leak detector. Check all valve stem packing for leaks.
Replace all refrigerant valve caps and tighten.
9. Check all refrigerant lines to insure that they will not
vibrate against each other or against other chiller
components and are properly supported.
10. Check all connections and all refrigerant threaded
connectors.
11. Look for any signs of refrigerant leaks around the
condenser coils and for damage during shipping or
installation.
12. Connect refrigerant service gauges to each refrigerant
circuit before starting unit.
www.DaikinApplied.com
Pre-Startup Electrical Check Out
Electrical power must be applied to the compressor crankcase
heaters 8 hours before starting unit to eliminate refrigerant
from the oil.
1. Open all electrical disconnects and check all power
wiring connections. Start at the power block and check
all connections through all components to and including
the compressor terminals. These should be checked
again after 3 months of operation and at least yearly
thereafter.
2. Check all control wiring by pulling on the wire at
connections and tighten all screw connections. Check
plug-in relays for proper seating and to insure retaining
clips are installed.
3. Put System Switch (S1) to the Emergency Stop position.
4. Put both circuit #1 & #2 switches to the Pumpdown and
Stop position.
page 12
5. Apply power to the unit. The panel Alarm Light will stay
on until S1 is closed. Ignore the Alarm Light for the check
out period. If you have the optional Alarm Bell, you may
wish to disconnect it.
6. Check at the power block or disconnect for the proper
voltage and proper voltage between phases. Check
power for proper phasing using a phase sequence meter
before starting unit.
7. Check for 120 Vac at the control transformer and at TB-2
terminal #1 and the neutral block (NB).
8. Check between TB-2 terminal #7 and NB for 120 Vac
supply for transformer #2.
9. Check between TB-2 terminal #2 and NB for 120 Vac
control voltage. This supplies the compressor crank case
heaters.
10. Check between TB-3 terminal #17 and #27 for 24 Vac
control voltage.
Startup
Refer to the MicroTech
to become familiar with unit operation before starting the chiller.
There should be adequate building load (at least 50 percent
of the unit full load capacity) and stable conditions to properly
check the operation of the chiller refrigerant circuits.
Be prepared to record all operating parameters required by
the "Compressorized Equipment Warranty Form". Return
this information within 10 working days to Daikin Applied as
instructed on the form to obtain full warranty benefits.
Startup Steps
• Verify chilled water flow rate.
• Calibrate thermal dispersion flow switch, see instructions
on
page 104
103
IOM 1206-13 • TRAILBLAZER

Startup and Shutdown Procedures

WARNING
III Controller information on
®
MODEL AGZ CHILLERS
®
Startup and Shutdown Procedures