Download Print this page

Maintenance - MasterCraft 058-8198-6 Owner's Manual

Air-powered 3-in-1 flooring stapler/nailer

Advertisement

Maintenance

Repairs must be performed by a qualified service technician.
Maintenance
Description
required
In-depth
inspection
broken parts,
Replace worn
or broken parts
Lubrication
See below
Lubrication: If the nailer and compressor are not equipped with an in-line lubrication system, place up to 6
drops of pneumatic tool oil into the air inlet before each work day or after every 2 hours of continuous use,
depending on the characteristics of the work-piece and the type of fasteners used.
Air-operated tools must be inspected periodically, and worn or broken parts must be replaced in order to
keep tools operating safely and efficiently.
Inspect and replace worn or damaged O-rings, seals, etc. Tighten all screws and caps frequently in order
to help prevent personal injury.
Keep the magazine and the nose of the tool clean and free of any dirt, lint, or abrasive particles.
When temperatures are below freezing, keep tools as warm as possible using any safe, convenient
method.
Disconnect the tool from the air compressor before adjusting, clearing jams,
servicing and maintenance, and reloading, and when it is not in use.
Tools or
materials
required
Worn or
Pneumatic
tool oil
Maximum service interval
Each use, or
Monthly
every 2 hrs
X
X
As needed
X
X

Hide quick links:

Advertisement

loading