5
Remove the screw (BBZ30P060FTB) and
then remove the Stay (DNH3328).
Note on assembling
∗3: When screw (BBZ30P060FTB) on the side
A of the USBA ASSY is removed, Stay and
screw of step
must be first attached.
Remove the screw (PMH30P080FTC).
Note on assembling
For LSYXJ: Lot 1 to 1010 and UXJCB: Lot 1 to 640,
fasten the Earth Lead Wire (DDX1286) together.
For details, refer to the "[3-2-2] Correspondence
for Earthing Improvement"
Remove the ten screws (BBZ30P060FTB) and
then remove the Shield Case (DNH3322) .
Note on assembling
When screw (BBZ30P060FTB)(∗3) on the side A of
the USBA ASSY is removed, screw of this position
must be attached after the attachment of the stay and
screw of step
, and the screw (∗3) on the side A of
the USBA ASSY.
∗4: When replacing the Shield Case, apply the Cussion
(DEC3749) and Gasket to the new Shield Case.
Shield Case (inside)
∗4
Gasket
[2-1-3] Diagnosis
Remove the Control Panel Section and Shield
Case (DNH3322).
(Refer to the "[2-1-1] Control Panel Section"
and "[2-1-2] Shield Case (DNH3322)")
-----------------------------------------------------------------
Connect the connector and then attach the
INVR ASSY.
Arrange the Control Panel Section as shown
in the photo.
Connect the three connectors disconnected
in step
of the "[2-1-1] Control Panel
Section".
Diagnosis
5
6
Front
Earth Lead Wire
Front
DJS-1000
6
7
Stay
USBA ASSY
:
x 10
∗4
Cushion
Control Panel Section
7
8
∗3
Shield Case
INVR ASSY
AUDB ASSY
CN7301
Chassis Section
8
A
B
C
D
E
F
33