Main Boiler Blowdown Valve; Water Bottle - FULTON VMP Series Installation, Operation And Maintenance Manual

Vertical multi-port fuel fired steam boiler
Table of Contents

Advertisement

Fulton Ltd
2.4.2.1

MAIN BOILER BLOWDOWN VALVE

The main blowdown connection is via a branch pipe.
2.4.2.2

WATER BOTTLE

Boilers are supplied with two water bottles containing the water level and pump on/off probes.
The water bottle blowdown cock should be connected to the auxiliary blowdown line.
VMP-IOMM-2018-2
Feedwater inlet
Front Boiler
blowdown
Rear Boiler
blowdown
Figure. 5 - Boiler Blowdown
1st. Low water
probe (blue)
2nd. Low water
probe (brown)
Pump off (grey)
Pump on (black)
Figure. 6 - Typical Water Bottle
INSTALLATION - 2
Page 9