Rain Gauge Installation - ACU-RITE 01608 Instruction Manual

Rain gauge station
Table of Contents

Advertisement

Rain Gauge Installation

• To ensure accurate rain measurement, the rain gauge MUST be placed on a
flat, level surface.
• Ensure the rain gauge is not placed in a low spot that could become flooded
or in an area where there are obstructions above it.
1. Separate the rain gauge cover from the rain gauge base.
2. Locate the two holes on the rain gauge base.
3. Fasten the rain gauge base to a sturdy surface, like a deck railing or a fence
post, with screws (included) using hand tools. (Power tools may slip during
installation, causing damage to the rain gauge.)
Setup is Complete
The rain gauge and wireless sensor will now synchronize with the display. It may
take a few minutes for synchronization to complete. Please refer to the
troubleshooting section of this manual if anything appears to be functioning
improperly.
SQUEEZE
SQUEEZE TABS TO OPEN
INSTALL 2 SCREWS USING
HAND TOOLS ONLY.
THEN RE-ATTACH UPPER CASING
10
OK

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

06042m

Table of Contents