Routing The Cable On The Weight Tower - Precor Discovery Selectorized Series Assembly Manual

Seated row
Hide thumbs Also See for Discovery Selectorized Series:
Table of Contents

Advertisement

3. Route the cable through the pulley bracket and around the pulley. Insert
the cable bolt into the rod end and tighten the nut using a ³ ₄-inch wrench.
Note: You will need to adjust the tension on the cable once the other cable
end is attached to the weight stack
Figure 17: Cable bolt position for Seated Row
4. Using a ³ ₈-inch hex bit and a ³ ₄-inch socket wrench, replace the pulley and
hardware removed previously. Tighten the screw to 500 in-lb (56 N-m) of
torque.
5. Using a #2 Phillips bit, reattach the pulley cover and screw removed in step
1. Tighten to 10 in-lb (1 N-m) of torque.
Seated Row Assembly Guide: Routing the Cable Assembly

Routing the Cable on the Weight Tower

The weight tower ships with the kick cover and pulley cover attached.
To route the cable on the weight tower:
1. Using a ⁵ ₃₂-inch hex bit, remove the screw and pulley cover and set them
aside.
Figure 18: Kick plate pulley cover removal
10

Advertisement

Table of Contents
loading

Table of Contents