Mira Activate Series Installation And User Manual page 30

Digital shower
Table of Contents

Advertisement

B.
Ceiling Fed
1
Note: Trim the pipework back to the required depth from the ceiling surface.
Remove all burrs and sharp edges.
2
Choose desired length of arm and cut neatly using a hack saw or a 22 mm pipe slice
fitted with a stainless steel cutting blade. Remove all burrs and sharp edges.
15 mm
copper pipe
Shower Arm
Cut here for ceiling fed
Noggin
29 - 48 mm
30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents