Figure B-22 Compressor Voltage Troubleshooting Flowchart (Sheet 1)
With an appropriately rated 
meter, verify all 3 phases of 
voltage before the mains 
All three phases of voltage 
No
present after mains fuses?
Verify and, if 
needed,replace 
Fuses – Refer to 
to Electrical Isolation 
Terminal Block Fuse 
Replacement 4.3 
Start
Carefully remove 
Mains Input Cover
fuses
Yes
Electrically isolate 
compressor – Refer 
1.7
Remove the Top 
Cover
Inspect all 
electronics for 
visible damage
Are there any signs 
Yes
of visible damage?
Replace damaged 
components
No
Verify Soft Start 
fuses (Closed‐Top 
Soft Start Only)
Replace fuse and 
Are the Soft Start 
refer to Determining 
fuses within 
No
the Cause of the 
specification?
Blown Fuse 5.5.2.6 
Yes
Verify IGBT cable to 
the IGBT connectors 
are installed 
correctly
Verify DC‐DC 
resistances
Replace DC‐DC and 
bearings – Refer to 
PWM Verification 
M-SV-001-EN Rev. G
End
Are resistances 
Yes
correct?
No
verify PWM and 
4.27.3 
A