Danfoss Turbocor TTS Series Service Manual page 26

Twin-turbine centrifugal series compressors
Hide thumbs Also See for Turbocor TTS Series:
Table of Contents

Advertisement

Figure 1-18 Connect DC Bus Test Harness (Open-Top Soft Start)
Multimeter
jacks
Figure 1-19 DC Bus Test Harness Connection Diagram (Open-Top Soft Start)
26 of 282
M-SV-001-EN Rev. G
ORIGINAL CONNECTIONS
Soft Start
(Top Side)
CONNECTIONS WITH DC BUS TEST HARNESS
Soft Start
(Top Side)
4.
Route the cables through the cable passage beside the DC-DC Converter, down into the
service side. Refer to "Figure 1-16 Cable Passage" on page 24.
When checks are complete, disconnect and remove the test harness. If the main housing has two cable passages, wither passage
can be used.
5.
Reinstall the Top Cover and Mains Input Cover. Refer to "4.2 Compressor Covers" on page 56.
6.
Reapply AC power to the Compressor.
7.
Insert the positive voltmeter lead into the DC (+) test harness lead, and the negative voltmeter
lead into the DC (-) test harness lead. Refer to "Table 1-3 Expected DC Bus Voltage" on page
25 for the expected DC bus voltage. If the DC bus voltage is not present, or if it is outside the
"Expected DC Bus Voltage" range shown in "Table 1-3 Expected DC Bus Voltage" on page 25,
verify proper incoming AC input, verify SCR Gates, and verify SCR Diodes. If incoming AC power
is correct, and the SCRs pass the diode and gate tests, replace the Soft Start.
There are no replaceable fuses present in the Open-Top Soft Start.
Harness to DC Link
J8
Harness to DC Link
J8
Volt
Meter
NOTE
NOTE
To J8 on Soft
Start
1 2 3
1 2 3
To harness
for J8
00.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents