BefoRe You BeGIn
4. PuRCHase addItIonal MateRIals
Check that you received all the materials listed on the packing list that came with your delivery. Check the
packing list against the Installation guide Parts list to determine what you need to buy at your local Home
hardware.
Following is a list of the additional items that you will need to install your system. Please check your
personalized parts list at the back of this guide for the section titled addItIonal ReQuIRed
suPPlIes and add them to this list.
r
4" or 5" Trenching Shovel
r
Trenching machine (optional)
r
round-nosed Shovel
r
Poly Pipe
r
Insert Fittings
5. Install BaCKfloW PReventIon devICe and sHut-off valve
Check your local code to determine the backflow prevention requirements for your area. You may need to
hire a professional to do the installation. Following are a few examples of backflow prevention devices.
Pressure vacuum Breaker
double Check valve assembly
ORBIT
SPRINKLER SySTEm DESIGNER™ InstallatIon GuIde
®
r
Poly Pipe Cutters
r
100' Measuring Tape
r
Marking Paint
r
Marking Pen
r
PTFE Pipe Tape
atmospheric vacuum Breaker / anti-siphon valve
r
r
r
r
r
r
r
Reduced Pressure Backflow Preventer
latex-dipped Work gloves
5. (Cont'd)
Need help?
Do you have a question about the ORBIT SPRINKLER SYSTEM DESIGNER and is the answer not in the manual?
Questions and answers