34
EasyLine EL3060 Series Commissioning Instructions

Installing the Gas Analyzer

Mounting the EL3060-CU Control Unit
Mounting the EL3060-Uras26 Analyzer Unit
ATTENTION
The EL3060-CU control unit weighs approx. 20 kg. The EL3060-
Uras26 analyzer unit weighs approx. 25 kg.
Unpacking and installing of the gas analyzer require two persons!
4 bolts M8 or M10 are required to mount the EL3060-CU control unit (not
supplied).
The control unit must be fitted in such a way that the terminal housing
points downwards (as shown in the dimension drawing (see page 26)).
4 bolts M8 are required to mount the EL3060-Uras26 analyzer unit (not
supplied).
The analyzer unit can be mounted with a vertical or with horizontal
alignment of the case.
·
The gas connections must point downwards for vertical assembly (as
shown in the dimension drawing (see page 28) on the bottom left).
·
For horizontal assembly, the case must be mounted in such a way
that the conduits for the connecting cable are at the bottom (as shown
in the dimension drawing (see page 28) on the top left). In order to
guarantee the degree of protection of case IP54, the supplied O-ring
(Æ 220 ´ 3 mm) must be inserted in the groove provided between the
bottom of the case and the case.