EasyLine EL3060 Series Commissioning Instructions

Checking the Seal Integrity of the Gas Feed Paths

Requisite Material
Checking the Seal Integrity of the Gas Feed Paths
·
Pressure gauge
·
Flexible tubing, length approx. 1 m
·
T-piece with shut-off valve
·
Air or nitrogen
ATTENTION
If the seal integrity test is to be carried out with air and if flammable gas
could be present in the sample gas feed path or is to be subsequently
introduced, the sample gas feed path must be purged with nitrogen
beforehand! The seal integrity test can be carried out with nitrogen
instead.
1
Seal the outlet of the gas feed path to be tested so that it is gas-tight.
2
Connect the T-piece with the shut-off valve to the inlet of the gas feed
path to be tested by means of the flexible tubing.
3
Connect the free end of the T-piece to the pressure gauge.
4
Blow air or nitrogen through the shut-off valve until the sample gas
feed path is under a positive pressure of p
positive pressure p
5
Close the shutoff valve. The pressure should not change measurably
in 3 minutes. A sharp drop in pressure is an indication of a leak in the
gas feed path being tested.
6
Repeat steps 1–5 for all gas feed paths in the gas analyzer.
ATTENTION
The following values apply for the test pressure and test duration after
the gas feed paths inside the gas analyzer have been opened:
» 400 hPa, maximum positive pressure p
Test pressure p
e
Test duration 15 minutes.
= 150 hPa.
e
» 50 hPa. Maximum
e
= 500 hPa.