Download Print this page

Unpacking, Shipping, And Installation - DACE PICO-200 Manual

Advertisement

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ▲
3601 E. 34th St. Tucson, AZ 85713 USA Tel. +1 520-882-6598 Fax +1 520-882-6599 email: pace@metallographic.com

2.0 Unpacking, Shipping, and Installation

2.1 Unpacking
The PICO-200 is shipped in a customized box. Remove any foam, paper, and
accessories. Remove machine from the box using at least two people.
2.2 Shipping
Measures WxDxH: 25.5 x 23.5 x 20 inches (650 x 600 x 510 mm)
Weight: Weight with crate (approximately 120 lbs).
2.3.1 Installation
Install the unit carefully! Improper installation voids warranty.
The PICO-200 should be placed on a flat and stable surface.
Connect the unit to a drain line and electrical outlet. Note that the machine only
accepts one input voltage (the voltage is noted on the machine plate and has been
pre-wired at the factory.) After all connections are completed, the system is ready to
be used.
Please read this instruction manual carefully and follow all installation, operating and safety guidelines.
PICO-200 Table Saw
When moving machine, lift by the base.
The PICO-200 is constructed with sensitive
electronic and mechanical components.
DO NOT DROP.
!
Caution: Use care when moving machine
I
M
NSTRUCTION
ANUAL
Web: http://www.metallographic.com
4

Advertisement

loading