Download Print this page

Maintenance - DACE PICO-200 Manual

Advertisement

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ▲
3601 E. 34th St. Tucson, AZ 85713 USA Tel. +1 520-882-6598 Fax +1 520-882-6599 email: pace@metallographic.com

5.0 Maintenance

5.1 Introduction
The PICO-200 wafering saw requires very minimal maintenance. However, to
increase the life of the saw, it is suggested that the cutting fluid be changed regularly
(weekly) using a cutting fluid containing an anti-corrosion additive (e.g DIACUT 2
cutting fluid).
After use it is also recommended that the unit be thoroughly rinsed and dried.
DIACUT oil-based cutting fluid
5.2 Cleaning the Outside Cabinet
The cabinet and hood shield should be cleaned occasionally with a moist cloth. Do
not use chemicals or cleaning abrasives.
5.3 Maintenance Schedule
Daily: Clean and dry out unit after use.
Weekly: Change out cutting fluid. Clean outside cabinet and hood
Monthly: Clean out internal fluid reservoir while replacing cutting fluid
Please read this instruction manual carefully and follow all installation, operating and safety guidelines.
PICO-200 Table Saw
I
NSTRUCTION
DIACUT 2 anti-corrosion cutting fluid
M
ANUAL
Web: http://www.metallographic.com
13

Advertisement

loading