Download Print this page

Adjustments - Eaton Cutler-Hammer CHGENLC100ATS1SE O & M Manual

Automatic transfer switch with atc-100 control

Advertisement

O & M Manual for the CHGENLC Automatic
Transfer Switch with ATC-100 Control
To manually operate:
1. Disconnect all sources of power.
2. Disconnect the J7 connector from the ATC-100 controller.
3. Locate the manual lever between the solenoids.
4. Locate the handle used to manually transfer the switch.
5. Attach the handle to the manual lever.
6. Move the lever up to go to Utility or move the lever down to
go to generator.
7. Once the manual operation is complete and automatic opera-
tion is desired, connect the sources of power.
8. Check for 120 Vac at the plug across the Utility - Utility
inputs if the Utility is available.
9. Check for 120 Vac at the plug across the Generator - Genera-
tor inputs if the Generator is available. (See troubleshooting
guide if values are above 130 Vac or below 110 Vac.)
10. Insert the J7 connector into the controller.
MANUAL
LEVER
MANUAL
LEVER
Figure 23. ATS Manual Operating Handle in Use Shown
Connected to Source 2.
IB00405002E
SECTION 6: ADJUSTMENTS
6.1 General
Refer to I.B. 01602019E, supplied with the ATS for ATC-100
Controller adjustments and programming.
For more information visit: www.eaton.com
Instructional Booklet
Effective: August 2007
Page 17

Advertisement

loading