7.4.1.4 Ground Bar
Note: The 100 A ground and neutral bars are the same. Refer to
Figure 35 for the correct location.
Step 1: Turn the utility (Source 1) power off and turn the genera-
tor (Source 2) control selector switch to the "OFF" posi-
tion before attempting to replace the ground bar
Step 2: Disconnect all wire cables from the ground bar.
Step 3: Remove the 1.5 in. long screw at the top of the ground
bar (see Figure 31) using a Phillips screwdriver.
SCREW
Figure 31. Replacing the Ground Bar.
Step 4: Remove the screw in the black base using a blade screw-
driver or 0.25 in. socket or nut driver (see
Figure 31). Remove the ground bar.
Step 5: Secure the new ground bar to the base plate using the
hardware supplied.
Step 6: Insert the 1.5 in. long screw into the top of the ground
bar. Use the hardware supplied if necessary.
Step 7: Reconnect all wire cables to the ground bar.
Step 8: Apply utility (Source 1) power and place the generator
control selector switch in the "AUTO" position after the
ground bar has been replaced. Test the system for proper
functionality.
7.4.1.5. Replacing the Contactor
E
1.5 in.
PHILLIPS
SCREW
Figure 32. Replacing the Contactor.
Note: If you are replacing the contactor in a 100 A or 200 A SE ATS, the
service entrance breaker must be removed first. Also jumpers between the
generator breaker (inside the ATS) and the E1, E2 terminals on the genera-
tor (Source 2) side of the contactor must be removed. Follow Steps 1
through 4 in Section 7.4.1.9 (for 100A & 200A Service Entrance breaker)
and Steps 3 & 4 in Section 7.4.1.10 (for 100A & 200A generator breaker).
Step 1: Turn the utility (Source 1) power off and turn the genera-
Step 2: Note their location then disconnect the twelve (12) red
Note: All wires connected to the contactor are labeled to ease
identification.
Step 3: Remove the four (4) screws securing the contactor to the
Step 4: Following the replacement steps for the 100 A or 200 A
Step 5: Secure the contactor onto the base plate using the hard-
Step 6: Reattach the twelve (12) red wires to the contactor.
Step 7: Reconnect all wire cables to the contactor as per their
For more information visit: www.eaton.com
O & M Manual for the CHGENLC Automatic
Transfer Switch with ATC-100 Control
N COIL 1
N COIL 2
N AUX COM
N AUX N.O.
E COIL 1
E COIL 2
tor (Source 2) control selector switch to the "OFF" posi-
tion before attempting to replace the contactor.
wires from the contactor (see Figure 32).
base plate using a blade screwdriver or 0.25 in. socket or
nut driver. Remove the contactor.
lugs (see Sections 7.4.1.7 and 7.4.1.8), remove the lugs
from the old contactor then install the lugs on the new
contactor.
ware supplied.
Examine each wire to find the name then refer to Figure
32 for the correct connection point.
original connections.
N1
N2
E AUX N.O.
E AUX COM
E2
E1