Step 5: The ATS Time Delay Normal (Utility) to Emergency (Gen-
erator) (TDNE) will begin to time after the generator
engine begins to run. After time out, the solenoid will
engage and the contactor will automatically switch from
the UTILITY to the GENERATOR position.
Step 6: Close the utility breaker described in Step 1 of
Section 5.2.
Step 7: The ATS Time Delay Emergency (Generator) to Normal
(Utility) (TDEN) timer will begin timing, and the solenoid
will engage and automatically switch from the GENERA-
TOR to the UTILITY position and the generator will shut
down after a cool down period.
O & M Manual for the EGS AutomaticTransfer Switch
with RTC-50 Control and Integral Loadcenter - 100 Amp
SECTION 6: ADJUSTMENTS
6.1 General
Refer to IB00405004E-70-8664, supplied with the ATS for
RTC-50 controller adjustments and functions.