Page 1
--- PROTF-70 / PROTF-55 --- (PROFESSIONAL BATTING TUNNEL) Installation Instructions Call Jaypro Sports Equipment at 1-800-243-0533 during regular business hours for technical support. www.jaypro.com Rev:A, 3/12 Page 1 of 7...
Page 2
1/4" WASHER LOCK MD STL, SS HS5077 1/4"-20 x 5 1/2" HEX HD SCREW, ZP HW2093 1/4" SAE FLAT WASHER, ZP MODEL NUMBER: CHECKED BY: PROTF-70 HN256 1/4"-20 NYLON LOCKNUT, ZP RC5012 3/16" GALV. AIRCRAFT CABLE x 76 FT PRODUCT NAME: HM251 3/16"...
Page 3
DESCRIPTION DATE INITIAL RELEASE 1/26/2010 Moune T. DETAIL D & E ADDED, UPDATED BOM QTY 3/2/2012 Moune T. DETAIL B DETAIL A (AIR CRAFT CABLE) DETAIL C (HOISTING ROPE) (HOISTING ROPE) 0'-2" CABLE END DETAIL D MID CABLE END DETAIL E (TYP AT 4 CORNERS) (TYP AT 4 MIDDLE POLES) 20'-10"...
Page 4
4) Layout the ground sleeves as shown in Figure 1. (Note: the PROTF-55 frame is designed for a 55 ft long net, and the PROTF-70 is designed for a 70 ft long net. If frame is being installed for a different length net, the overall length of the frame should be 4 ft longer and wider than the net.)
Page 5
12) Lower the other hoisting ropes and attach the spring clips to the cable. 13) Evenly raise the net to its maximum height. You may need to adjust where the intermediate hoisting ropes are attached, from one side of a zip tie to the other. 14) Adjust the position of the net so it is centered.
Need help?
Do you have a question about the PROTF-70 and is the answer not in the manual?
Questions and answers