Lifting; Wall Mounting - Ip21 (Nema 1) And Ip54 (Nema 12) Units - Trane TR200 Operating Instructions Manual

D-frame, 110-400 kw
Hide thumbs Also See for TR200:
Table of Contents

Advertisement

Airflow
The necessary airflow over the heat sink must be secured.
The flow rate is shown in Table 2.2.
The fan runs for the following reasons:
AMA
DC Hold
Pre-Mag
DC Brake
60% of nominal current is exceeded
Specific heatsink temperature exceeded (power
size dependent)
Specific Power Card ambient temperature
exceeded (power size dependent)
Specific Control Card ambient temperature
exceeded
Frame
Door fan/top fan
D1h/D3h
3
102 m
/hr (60 CFM)
D2h/D4h
3
204 m
/hr (120 CFM)
Table 2.2 Airflow

2.3.2 Lifting

Improper Unit Lift!
Test lift unit approximately 24 inches to verify proper
center of gravity lift point. To avoid dropping of unit,
reposition lifting point if unit is not level. Failure to
properly lift unit could result in unit dropping and possibly
crushing operator/technician which could result in death
or serious injury and possible equipment or property-only
damage.
Always lift the frequency converter using the dedicated
lifting eyes. Use a bar to avoid bending the lifting holes.
CAUTION
The angle from the top of the frequency converter to the
lifting cables should be 60° or greater.
BAS-SVX54B-EN
TR200 D-Frame Operating Instructions
Heatsink fan
3
420 m
/hr (250 CFM)
3
840 m
/hr (500 CFM)
Illustration 2.1 Recommended Lifting Method
2.3.3 Wall Mounting - IP21 (NEMA 1) and
IP54 (NEMA 12) Units
Consider the following before selecting the final instal-
lation site:
Free space for cooling
Access to open the door
Cable entry from the bottom
Installation
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents