Fronius Symo Hybrid 3.0 Installation Instructions Manual page 29

Energy package, grid-connected inverter
Table of Contents

Advertisement

*) The R 120 Ohm terminating resistor is supplied with the Fronius Smart Meter
A DC connection and ground connection must also be established between the battery and the inverter. The
connection of the individual lines was illustrated in the preceding chapters. The installer is responsible for
choosing the cables.
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Symo hybrid 4.0Symo hybrid 5.0

Table of Contents