Installing The Cable Conduit; Installing The Upper Section - Kessel Pumpfix F Comfort Manual

Backwater pumping station
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 23
3.10

Installing the cable conduit

- Bring the cable conduit (DN70) up to the cable duct <41>
(DN50) on the drain body and fit it.
For changes of direction use max. 45° bends.
Provide a cable tube for later retrofitting. If this cable tube has to
be installed in the upper section, drill a hole with the KESSEL
hole saw (article number 50101) or a standard Ø 60 mm hole saw
and put in the pipe sealing gasket (article number 850114).
3.11

Installing the upper section

Depending on installation depth, the upper section (insertion depth of the
upper section <3>) must be cut to length or given recesses
<67> for the pipe connections which are routed into the drain body
<1> at the side.
The upper section <3> may only be extended using a maximum
of 2 extension sections,so that technicians can still reach down to
the drain body for maintenance purposes.
- Insert the sealing gasket <37> grease-free into the groove on the
drain body <1>.
- Grease the sealing lips of the sealing gasket <37>.
- Push the upper section <3> into the drain body and align it.
010-843
Installation
36 / 132
41
Fig. [16]
3
Fett
37
1
Fig. [17]
67
2017/04

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spz 1000

Table of Contents