General Hints For Laying According To Standards - probst HVZ-ECO Operating Instructions Manual

Hydraulic installation clamps for universal use with excavators
Hide thumbs Also See for HVZ-ECO:
Table of Contents

Advertisement

Available languages

Available languages

Operation
36 / 41
The laying cycle is finally finished, when the springs of the ADV (see  in fig.1 ) are complete visible.
Fig. 1
7.3

General hints for laying according to standards

After the laying process is done it is necessary to move the new laid paving stones a little bit in direction of the
facing bedding sand (the best way for the operating personal is to use his feet). This is the only way to achieve a
standard joint (3 – 5 mm). If it is necessary to start with manual laying before you can use the installation clamp,
take care that the grid system of the paving layers is correct. Do not manipulate the joints with the rubber
hammer, because the result will be a non-standard paving area.
51400034
V3
GB

Advertisement

Chapters

Table of Contents
loading

Table of Contents