probst HVZ-ECO Operating Instructions Manual page 78

Hydraulic installation clamps for universal use with excavators
Hide thumbs Also See for HVZ-ECO:
Table of Contents

Advertisement

Available languages

Available languages

Adjustments
Adjusting the side clamping corresponding to the stone
layer breadth with a socket key  Fig 27.
The adjusting must have the same value at the left and
right side (orientation on adjusting scale  Fig 26).
Then move the rotary protection downwards to secure
the side clamping (see Fig. 25).
Adjust the height of the side gripping to the middle of
the stone layer. Close the side gripping.
Remove nuts and screws of the Side clamping (). Hold
thereby the side clamping, so that it does not fall
downward.
Danger of injury of the hands!
51400034
Fig. 26
Adjust side clamping to the corresponding position (
Insert both screws and secure them with the nuts.
Close the side clamping and check, if the side clamping
is in the middle of the stone layer.
Fig. 28
V3
= Enlargement of the side clamping
= Reduction of the side clamping
28 / 41
Fig. 27
).
Fig. 29
GB

Advertisement

Chapters

Table of Contents
loading

Table of Contents