The 4 to 20 mA pressure transducer is connected to AI 2 on terminals 4 (-) and 12 (+)
A through-connection must be made between 5 and 7.
Make sure that dipswitch AI 2 is in the Current signal position (down).
PID control is started by connecting 8 (DI 1) to 6 (+24 V).
Water thermostat (°C) or float must be connected to 9 (DI 2) and 6 (+24 V).
A fault can be reset remotely by connecting 10 (DI 3) to 6 (+24 V).
To switch from target setpoint 1 to 2, connect 14 (DI 4)
to 12 (+24 V).
Flushing is activated by connecting 16 (DI 6) to 12 (+24 V).
Location and selection of dipswitch AI 2
Vacon 100 Flow
31
page