Waeco AirCon Service Center Operating Manual page 37

Air conditioning service unit
Table of Contents

Advertisement

VAS 6380B / VAS 6381B
8.8.4
Selecting connections
1. Select parameters according to the existing connections of the air
conditioning system:
– Air conditioning system has a high pressure and a low pressure
connection:
Select HP/LP.
– Air conditioning system only has a high pressure connection:
Select HP.
– Air conditioning system only has a low pressure connection:
Select LP.
2. Confirm with ENTER.
3. Select whether after the filling process a trial run of the air
conditioning unit should be carried out or not.
Confirm with ENTER.
4. When all settings have been made, start the operations with ENTER.
8.8.5
After the completion of the air conditioning service
✓ After the air conditioning service has finished, you are prompted to
disconnect the hoses of the AirCon Service Center from the vehicle air
conditioning system.
1. Disconnect the service hoses (10) and (11) and press ENTER to
confirm.
✓ The service hoses are then emptied. The unit is then ready for further
use.
2. Screw the valve caps of the air conditioning system back on the
connections.
H P / L P P O R T
H P P O R T
L P P O R T
E N T E R - O K S T O P - E X I T
A / C S y s t e m t e s t
a t t h e e n d ?
E N T E R - O K S T O P - E X I T
P r o c e s s s t a r t ?
E N T E R - O K S T O P - E X I T
Operation
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vas 6380bVas 6381b

Table of Contents