Transporting And Unpacking - Promeba PC-610/7 User Manual

Stretcher
Table of Contents

Advertisement

USER MANUAL //
Review 12/19
03
INSTALACIÓN
03.1

Transporting and unpacking

First remove the packaging carefully to prevent dama-
ge to the exterior of the stretcher.
1. Transporting
· Always fix the load, if piling up is necessary always
follow the scheme shown.
· Transport the leveled load and following all precepts
and rules for the transport of loads.
2. Unpacking
· Place the box on a flat, stable surface and open the
seal being careful not to damage the inside.
· Remove the stretcher from the inside of the load as
shown in the scheme below.
Each stretcher has been minutely examined when lea-
ving the factory. To ensure that it has not been dete-
riorated during transport, please carefully inspect the
outside and the inside, and in case of finding any im-
perfection, immediately contact the installer.
For an optimum operation, the stretcher must be leve-
led.
16
STRETCHER PC-610/7
PACKING UNIT
RRESPECT THE PACKING'S TRANSPORT POSITION
PRODUCT'S UNPACKING
ALWAYS USE A FLAT BASE SUPPORT

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc-617/2Pc-617/1Pc-617/5

Table of Contents