INSTALLATION

02.1

Transport and unpacking

First carefully remove the packaging to prevent the da-
mage of the product. Take the wooden cover away and
use a crane to move vertically.
1. Transport with a crane (high load)
· Thread tapes through the upper platform for its trans-
port (as shown in graphs).
· Transport the load level following all the precepts and
regulations for the transport of suspended loads.
2. Transport with a forklift
· Place a pallet or a flat surface under the stretcher su-
pport and transport it transversely.
· Do not load the stretcher support directly on the fork-
lift without a pallet or flat support surface.
· Do not load the support stretcher longitudinally on
the forklift if a sufficiently long base is not available.
· Every set has been throughly inspected leaving the
factory. To ensure that it has not been damaged during
the transport, it is requested to carefully examine the
interior and exterior, and in case of finding any dama-
ge, communicate immediately to the installer.
· The stretcher and support set should be levelled for an
optimum performance.
10
TRANSPORT WITH A CRANE
FIX THE TAPES TO LEVEL THE LOAD WEIGHT
TRANSPORT WITH A FORKLIFT
USE ALWAYS A FLAT SUPPORT SURFACE