FLARM Technology Ltd
Hinterbergstrasse 15
CH-6330 Cham
No collision warnings will be issued
FLARM systems in other aircraft will not issue collision warnings about you
All aircraft may not be shown, e.g. when no track or stealth mode are active
Flight Recorder
Indicates if IGC flight logs are currently being recorded (IGC files). This is based
on FAI/IGC rules and independent of the FLARM Air/Ground mode.
Errors
Shows the errors, if any, generated by FLARM. The Error Code (Hex, see Appendix
B), Severity, and Error Message are shown. See example below.
The Severity level (1-3) has the following meaning.
Severity
Meaning
1
Information only, normal operation.
2
Functionality may be reduced.
3
Fatal error; FLARM will not work.
If an error occurs (normally during startup), it will be shown until the device is
restarted.
3.3.2
System
Shows relevant information about the FLARM hardware and firmware, Hub version,
and FLARM configuration. It also shows activated features.
This section can be checked to quickly ensure that the correct device/aircraft is
being configured, that the essential configuration items are correct, and that the
FLARM firmware is not expired.
3.3.3
Time & Location
Shows current data received from the GNSS and barometric sensors.
POWERFLARM
FUSION USER AND
MAINTENANCE
MANUAL
Date: 2020-11-10
Version: 1.0
Page: 21 of 49
Document Number:
FTD-078
Need help?
Do you have a question about the FUSION PowerFLARM and is the answer not in the manual?