This guide describes how to get started with raw ADC data capture from the xWR mmWave sensor EVMs.
This is a Class A product. In a domestic environment, this product
may cause radio interference, and the user may be required to take
adequate measures.
1
1
2
Data and Supply Cable Connections
3
Configure Static IP Address on the PC
....................................................................................................................
4
5
6
DCA1000EVM Quick Start Guide
WARNING
...............................................................................................................
.....................................................................................
...................................................................................
...............................................................................................
Copyright © 2018, Texas Instruments Incorporated
Contents
List of Figures
...............................................
...........................................................................
Quick Start Guide
SPRUIK7 - May 2018
DCA1000EVM Quick Start Guide
2
2
2
3
3
4
5
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DCA1000EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DCA1000EVM

  • Page 1 Configure Static IP Address on the PC ........................COM Ports ....................Capture and Post ADC Data ................Visualization of the Captured Raw ADC Data SPRUIK7 – May 2018 DCA1000EVM Quick Start Guide Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 2 2. Connect the microUSB and Ethernet cables to the PC interface, as shown in Figure 2. The DCA1000 and the xWR EVM are powered with 5-V, 2.5-A supplies. Figure 2. Data and Supply Cable Connections DCA1000EVM Quick Start Guide SPRUIK7 – May 2018 Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 3 6. The device manager shows the COM ports, as shown in Figure 4. The RS232 COM port is shown as XDS110 Class Application/User UART. Figure 4. COM Ports SPRUIK7 – May 2018 DCA1000EVM Quick Start Guide Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 4 8. Select the DataCapturedemo_xWR.lua file from the \mmwaveStudio\Scripts\ folder by clicking on the browse button, then click on the run button. Figure 5. Capture and Post ADC Data DCA1000EVM Quick Start Guide SPRUIK7 – May 2018 Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 5 Data is captured by the captured card for a sample profile and frame, and the captured data is processed and displayed as shown in Figure Figure 6. Visualization of the Captured Raw ADC Data SPRUIK7 – May 2018 DCA1000EVM Quick Start Guide Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 6 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...

Table of Contents