Pre-Startup Checklist - GE H301 Series Operating Manual

High speed reciprocating compressors
Table of Contents

Advertisement

14 | Chapter 2: Introduction

Pre-Startup Checklist

Use the pre-startup checklist to bring the compressor online. Verify that all steps
are complete before initial compressor loading..
USE APPROPRIATE PROCEDURES TO DEPRESSURIZE.
USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.
DO NOT TOUCH COMPRESSOR WHEN IN OPERATION.
SHUTDOWN COMPRESSOR AND PERFORM LOCK-OUT/TAG-
F L A M M A B L E
FLAMMABLE GAS, NO OPEN FLAME.
Complies with ANSI Z535, ISO 3864, OSHA 1910.145 (f) (5)
H I G H P R E S S U R E
Complies with ANSI Z535, ISO 3864, OSHA 1910.145 (f) (5)
T O X I C A N D P O I S O N O U S
S U B S T A N C E S
Complies with ANSI Z535, ISO 3864, OSHA 1910.145 (f) (5)
D A N G E R O U S T E M P E R A T U R E S
Complies with ANSI Z535, ISO 3864, OSHA 1910.145 (f) (7)
E L E C T R I C A L H A Z A R D
DISCONNECT POWER.
Complies with ANSI Z535, ISO 3864, OSHA 1910.145 (f) (7)
E X P L O S I V E
OUT PROCEDURES TO AVOID SERIOUS INJURY.
Complies with ANSI Z535, ISO 3864, OSHA 1910.145 (f) (7)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H302 series

Table of Contents