Graco ThermoLazer 258699 Operation page 15

Pavement marking system
Hide thumbs Also See for ThermoLazer 258699:
Table of Contents

Advertisement

Replacing SmartDie
Screed Box Spring
1. Position replacement spring as shown below and
slide into spring guard.
ti14551a
2. Push spring up through guard and loop end around
guard pin until spring sits in groove.
3. Set SmartDie
screed box on its side.
313787C
ti14549a
ti14553a
4. Loop open end of spring and guard over first pin on
SmartDie
screed box. Then push spring guard up
and over second pin on SmartDie
ti14550a
NOTE: Make sure spring end is fully engaged in groove
to prevent spring from coming loose.
Line Thickness Adjustment
To adjust the thickness of the line of material delivered
from the screed box, loosen all acorn nuts on the Smart-
Die
screed box gate and move the spacer until desired
line thickness is achieved.
ti14272a
Typical settings on pavement: 0.060 - 0.125 in.
(0.153 - 0.318 cm).
Typical settings on metal stencil: Flush - 0.0 in. (0.0 cm).
SmartDie
Screed Box
screed box.
ti14552a
ti14273a
15