Graco ThermoLazer 258699 Operation page 14

Pavement marking system
Hide thumbs Also See for ThermoLazer 258699:
Table of Contents

Advertisement

SmartDie
Screed Box
3. Set SmartDie
screed box on ground but not in
locked open position.
4. Remove hairpin cotter pin connecting SmartDie
screed box to rod clevis.
5. Press down SmartDie
6. Disengage SmartDie
Die
lever and carefully remove SmartDie
Adjustment
The height and angle of the SmartDie
be adjusted to ensure a solid line of material on any sur-
face. For optimum delivery of thermoplastic material,
make sure the SmartDie
allel to road surface.
SmartDie
Screed Box Gate
SmartDie
Screed Box Die Runner
14
ti14267a
ti14155a
lever.
ti14270a
screed box rod from Smart-
.
screed box can
screed box die runner is par-
SmartDie
Screed Box Trough
ti14414a
1. Loosen two bolts on SmartDie
ing bracket.
2. Slide mount down until leading box edge of Smart-
Die
screed box die runner is just off of the ground
surface. For best performance, raise leading edge
0 - 0.03 in. (0 - 0.076 cm) off ground surface.
SmartDie
Screed Box Gate
SmartDie
3. Tighten bolts on screed box mounting bracket.
screed box mount-
ti14504a
ti14505a
SmartDie
Screed Box Trough
0 - 0.030 in.
Screed Box Die Runner
ti14506a
ti14545a
313787C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermolazer 257500

Table of Contents